DOE/EA-1636: Mitigation Action Plan

Based on DOE/EA-1636, mitigation action plan for replacing wood poles on the Albany-Burnt Woods and Santiam Toledo transmission lines.

Office of NEPA Policy and Compliance

May 6, 2009
minute read time

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project; Oregon

Bonneville Power Administration (BPA) issued a mitigation action plan for DOE/EA-1636, which analyzed a proposal to replace wood pole structures on the existing Albany-Burnt Woods single-circuit, 115‑kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230‑kV transmission line.

For more information, see Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project.

 

  • This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon.