Big Eddy-Chemoweth No. 2 Impairment Remedies- Updated Scope of Work CX(s) Applied: B1.3Date: 09/30/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 30, 2016Big Eddy-Chemoweth No. 2 Impairment Remedies- Updated Scope of Work
CX(s) Applied: B1.3
Date: 09/30/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform work at seven locations along approximately 3.3 miles of the Big Eddy-Chenoweth No. 2 230 kilovolt transmission line.