233-H Room 11 Modification for Direct Disposal CX(s) Applied: B2.2Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 26, 2016233-H Room 11 Modification for Direct Disposal
CX(s) Applied: B2.2
Date: 07/26/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Room 11 of building 233-H is increasing its work scope because building 238-H is no longer going to be operated. This added work will be performed in the storage hoods of Room 11. Due to the nature of the work, modifications are required to the Tritium Air Monitoring system. Rev. 1 of this EEC is to modify the fire protection system as required.