Raver-Paul Insulator Replacement Project CX(s) Applied: B1.3Date: 42569 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 18, 2016Raver-Paul Insulator Replacement Project
CX(s) Applied: B1.3
Date: 42569
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to replace deteriorating transmission line insulator assemblies and associated hardware at the 32 locations listed in the table below.