CX-014994: Categorical Exclusion Determination

Verizon Franklin Park Wireless Installation CX(s) Applied: B1.19Date: 05/02/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

May 2, 2016
Estimated Read Time   min

Verizon Franklin Park Wireless Installation
CX(s) Applied: B1.19
Date: 05/02/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to allow Verizon Wireless to install an unmanned telecommunications facility at tower 2/3 of the Ross-Alcoa transmission line.

Document(s) Available for Download