CX-014289: Categorical Exclusion Determination

Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200) CX(s) Applied: B1.3Date: 09/21/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

September 21, 2015
Estimated Read Time   min
Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200)
CX(s) Applied: B1.3
Date: 09/21/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, supervision, materials, equipment, and transportation required to locate, excavate, and inspect two locations on the Big Hill 48-inch Raw Water Intake Structure pipeline. All excavation work must be performed within the existing pipeline right-of-way and the post repair work must return the disturbed areas to the original contours.

Document(s) Available for Download