Salt Batch 9 Feed Qualification CX(s) Applied: B3.6Date: 08/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 20, 2015Salt Batch 9 Feed Qualification
CX(s) Applied: B3.6
Date: 08/20/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
In support of Salt Batch 9, feed material for the Actinide Removal Process (ARP) and the Modular Caustic Side Solvent Extraction Unit (MCU) must be carefully qualified before the material can be processed through those 2 units.
CX(s) Applied: B3.6
Date: 08/20/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
In support of Salt Batch 9, feed material for the Actinide Removal Process (ARP) and the Modular Caustic Side Solvent Extraction Unit (MCU) must be carefully qualified before the material can be processed through those 2 units.