CX-014468: Categorical Exclusion Determination

Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106) CX(s) Applied: B1.3Date: 11/04/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

November 4, 2015
Estimated Read Time   min
Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106)
CX(s) Applied: B1.3
Date: 11/04/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all labor, tools, materials, equipment, supplies, transportation, facilities, services and supervision required to replace the West Hackberry raw water injection pump pad discharge piping and recycle line.