Construction and Operation of the Integrative Genomics Building at the Lawrence Berkeley National Laboratory LB-CX-15-03 CX(s) Applied: B1.15, B1.24, B1.33, B3.6, B3.12, B3.15Date: 04/21/2015Location(s): CaliforniaOffices(s): Berkeley Site Office
Office of NEPA Policy and Compliance
April 21, 2015Construction and Operation of the Integrative Genomics Building at the Lawrence Berkeley National Laboratory LB-CX-15-03
CX(s) Applied: B1.15, B1.24, B1.33, B3.6, B3.12, B3.15
Date: 04/21/2015
Location(s): California
Offices(s): Berkeley Site Office
The U.S. Department of Energy (DOE) proposes a project at the Lawrence Berkeley National Laboratory that includes: the design, construction and operation of a new Integrative Genomics Building (IGB) and a modular utility plant; the relocation of staff and programs to the IGB; and a contract modification to extend the term of the existing parcel leases for the IGB and MUP sites.