Removal of Out of Service Equipment and Installation of high-efficiency particulate air Filter in Test Reactor Area 670 Pump Test Room CX(s) Applied: B2.5Date: 05/19/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
May 19, 2015Removal of Out of Service Equipment and Installation of high-efficiency particulate air Filter in Test Reactor Area 670 Pump Test Room
CX(s) Applied: B2.5
Date: 05/19/2015
Location(s): Idaho
Offices(s): Idaho Operations Office
The room commonly called the Pump Test Loop is located in TRA-670 on the south side of the First Basement and just west of the Dry Transfer Cubicle (DTC). The room's lower level contains out of service (OOS) equipment that supported testing of Advanced Test Reactor (ATR) Loop pumps. The proposed action would remove the OOS equipment and prepare the room for installation of permanent HEPA filter housing into the DTC exhaust ventilation system.