CX-013419: Categorical Exclusion Determination

Disconnect Switch Stand Grounding Upgrades - Spokane District CX(s) Applied: B4.6Date: 02/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

February 6, 2015
Estimated Read Time   min

Disconnect Switch Stand Grounding Upgrades - Spokane District
CX(s) Applied: B4.6
Date: 02/06/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

The Bonneville Power Administration (BPA) proposes to upgrade grounding at several disconnect switch stand locations located in the Spokane District. Grounding upgrades are necessary to increase employee safety when manually operating the disconnect switches.

Document(s) Available for Download