CX-012571: Categorical Exclusion Determination

Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

August 11, 2014
Estimated Read Time   min
Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building
CX(s) Applied: B1.15
Date: 41862
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Installation of the Pre-fabricated Building to place over the Manway( installed under C-DCP-H-13005).