Building 94 HVAC Upgrades Project CX(s) Applied: B1.15, B1.23, B2.1, B2.2Date: 41852 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 1, 2014Building 94 HVAC Upgrades Project
CX(s) Applied: B1.15, B1.23, B2.1, B2.2
Date: 41852
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Upgrades to B94 HVAC including replacement of air handling units, hot water boilers, exhaust fans, chilled water system, process chilled water system, and controls.
CX(s) Applied: B1.15, B1.23, B2.1, B2.2
Date: 41852
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Upgrades to B94 HVAC including replacement of air handling units, hot water boilers, exhaust fans, chilled water system, process chilled water system, and controls.