CX-012495: Categorical Exclusion Determination

Building 6 Stack Replacement CX(s) Applied: B1.3Date: 41855 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

August 4, 2014
Estimated Read Time   min
Building 6 Stack Replacement
CX(s) Applied: B1.3
Date: 41855
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory

Replace two existing R&D project exhaust stacks with duplicate stacks. One stack is 18" dia. x 40' tall. One stack is 24" x 40' tall. Both stacks have a 4' dia. x 12' tall silencer to top.

Document(s) Available for Download