Strategic Petroleum Reserve
Photo
Photo Title
Prover loop on the meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Meter skid, prover loop and pipelines at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Brine/raw water line at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Crude oil, raw water/brine pipes on the high pressure pump pad at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Raw water pumps on the high pressure pump pad at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Prover loop on meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Wellhead at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Well pad/wellhead and valves at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Wellhead over a crude oil storage cavern at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Wellheads at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Secretary of Energy and Russian Minister visiting Bryan Mound site in 2002.
Caption
The United States/Russia Commercial Energy Summit was held in Houston, Texas, October 1-2, 2002. As part of the summit, Secretary Abraham and Russian Minister of Energy Igor Yusufov visited DOE's Strategic Petroleum Reserve Bryan Mound site in Freeport, Texas.
Photo
Photo Title
Overview of crude oil pumps on the high pressure pump pads at the West Hackberry site.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Fresh water tanks at the West Hackberry site.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Aerial view of the brine pond booster pumps/oil brine separator ponds at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Aerial of well pad at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Meter skid at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Wellhead at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Wellhead at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Crude oil prover loop at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
High pressure pump pad at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
High pressure pump pad at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
228 034 002
Caption
METER SKID AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 033 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 031 002
Caption
PIG LAUNCHER/RECEIVER AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 032 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 030 002
Caption
METER SKID AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 029 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 028 002
Caption
CEMENTED WELL PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 027 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 026 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 025 002
Caption
RAW WATER PUMP AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 057 002
Caption
AERIAL OF WORK OVER RIG ON A BAYOU CHOCTAW WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 001 003
Caption
RAW WATER BOOSTER PUMPS AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 002 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
Photo
Photo Title
228 003 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 004 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 007 003
Caption
WELLHEAD AND RIG.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 005 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 006 003
Caption
WELL HEAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 008 003
Caption
CLOSE-UP OF A WELLHEAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 009 003
Caption
WELL HEAD WITH PIPING, WORK OVER RIG AND BLANKET OIL DELIVERY TRUCKS.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 010 003
Caption
WELLHEAD AT BIG HILL SPR SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 011 003
Caption
WELL HEAD WITH MAINTENANCE WORKER.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 012 003
Caption
PIPING ON A WELL PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 013 003
Caption
CAVERN PIPING ON WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 014 003
Caption
WELLHEAD AT BIG HILL SPR SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 015 003
Caption
WELL HEAD AND PIPING ON A WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 016 003
Caption
WELL PAD PIPING AND WORK OVER RIG AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 017 003
Caption
RAW WATER INTAKE STRUCTURE AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 018 003
Caption
RAW WATER INTAKE STRUCTURE AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 020 003
Caption
HIGH PRESSURE PUMP PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 021 003
Caption
POWER SUB-STATION, MAINTENANCE GARAGE, AND MASTER CONTROL CENTER AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAWDOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 022 003
Caption
WELL PAD UNDER CONSTRUCTION AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 023 003
Caption
WELL PADS WITH FRAC TANKS AND A WORK OVER RIG.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 024 003
Caption
WELL PAD UNDER CONSTRUCTION AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAWDOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 006 002
Caption
Drilling rig at Well 20A. Rig on Well 15A in background.
With a capacity of 727 million barrels, the U.S. Strategic Petroleum Reserve is the largest stockpile of government-owned emergency crude oil in the world. Established in the aftermath of the 1973-74 oil embargo, the SPR provides the President with a powerful response option should a disruption in commercial oil supplies threaten the U.S. economy. It is also the critical component for the United States to meet its International Energy Agency obligation to maintain emergency oil stocks, and provides a national defense fuel reserve.
Photo
Photo Title
228 008 002
Caption
PIPING AND BRINE PUMPS FOR INTERIM FILL PHASE II.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 005 004
Caption
THE WELL HEAD ON PAD 108 IS THE FIRST ONE BUILT DURING THE EXPANSION AT THE SITE.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT IN AN EMERGENCY, THE OIL COULD BE WITH- DRAW AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 005 002
Caption
Pumps on pedestals at high pressure pumping station.
With a capacity of 727 million barrels, the U.S. Strategic Petroleum Reserve is the largest stockpile of government-owned emergency crude oil in the world. Established in the aftermath of the 1973-74 oil embargo, the SPR provides the President with a powerful response option should a disruption in commercial oil supplies threaten the U.S. economy. It is also the critical component for the United States to meet its International Energy Agency obligation to maintain emergency oil stocks, and provides a national defense fuel reserve.
Photo
Photo Title
228 004 002
Caption
BRINE RESERVOIR SOUTH OF CAVERN 15.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 003 002
Caption
PIPING TO PUMPING STATION FROM BRINE BOOSTER STATION WITH RIG ON WELL 15A IN BACKGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 002 002
Caption
LOOKING NORTH AT DRILLING RIG ON WELL NO. 15 WITH BRINE PIPELINE IN FOREGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 001 002
Caption
WELLHEAD NO. 18 IN FOREGROUND WITH THE DRILLING RIG ON WELL NO. 18A IN BACKGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 011 005
Caption
MEASUREMENTS BEING TAKEN AT THE FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 002 001
Caption
AERIAL VIEW OF THREE (WHITE) DOE CRUDE OIL STORAGE TANKS IN THE FOREGROUND AT THE SUNOCO TERMINAL NEAR NEDERLAND, TX.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 004 001
Caption
CREW INSTALLING SQUEEGEE INTO THE NEW DOE CRUDE OIL 42-INCH PIPELINE NEAR NEDERLAND, TEXAS, TO WEST HACKBERRY, LA.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THE FIRST CRUDE OIL WAS PUMPED IN BEHIND THE WATER FLUSH AND BEGAN CREEPING AT LESS THAN ONE MILE AN HOUR THROUGH THE LINE.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 005 001
Caption
A CREW TURNS ON THE VALVES AT AN OIL TERMINAL NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THIS SENDS CRUDE OIL THROUGH 42-INCH UNDERGROUND PIPELINE EXTENDING 42 MILES SOUTH EAST TO THE DOE WEST HACKBERRY, LA., STORAGE CAVERNS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 006 001
Caption
PUSHING SQUEEGEE INTO REDUCER FOR LAUNCHING IN THE 42-INCH PIPELINE NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 008 001
Caption
DOE 42-INCH PIPELINE PUMP STATION AND MANIFOLD PIPING AT SUNOCO TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 001 001
Caption
TANKER UNLOADING (DOE) CRUDE OIL (ON THE NATCHEZ RIVER) AT THE SUNOCO TERMINAL NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THE CRUDE IS PUMPED TO DOE STORAGE TANKS AND THEN INTO A 42-INCH PIPELINE TO THE WEST HACKBERRY, LA.,STORAGE CAVERNS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 005 002
Caption
ST. JAMES DOCK #1 - 84 INCH STEEL PILE FOR DOLPHINS ON BRIDGE IN FOREGROUND.
ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS & CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE ST. JAMES TERMINAL IS LOCATED ON ABOUT 173 ACRES OF LAND, 30 MILES SOUTHWEST OF BATON ROUGE, ON THE MISSISSIPPI RIVER. IT IS THE ONLY TERMINAL OWNED BY THE DOE'S STRATEGIC PETROLEUM RESERVES. THE TERMINAL FACILITY HAS TWO DOCKS WHERE LARGE TANKERS UNLOAD CRUDE OIL AND SIX STORAGE TANKS WITH A TOTAL CAPACITY OF 2 MILLION BARRELS. THE TERMINAL CONNECTS VIA PIPELINE TO THE BAYOU CHOCTAW AND WEEKS ISLAND STORAGE SITES.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 006 002
Caption
OVERALL VIEW OF THE CRUDE OIL SHORTAGE TANKS AT ST. JAMES TERMINAL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COSTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS & CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE ST. JAMES TERMINAL IS LOCATED ON ABOUT 173 ACRES OF LAND, 30 MILES SOUTHWEST OF BATON ROUGE, ON THE MISSISSIPPI RIVER. IT IS THE ONLY TERMINAL OWNED BY THE DOE'S STRATEGIC PETROLEUM RESERVES. THE TERMINAL FACILITY HAS TWO DOCKS WHERE LARGE TANKERS UNLOAD CRUDE OIL AND SIX STORAGE TANKS WITH A TOTAL CAPACITY OF 2 MILLION BARRELS. THE TERMINAL CONNECTS VIA PIPELINE TO THE BAYOU CHOCTAW AND WEEKS ISLAND STORAGE SITES.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 011 002
Caption
WORKER CONTROLS FLOW OF CRUDE OIL THROUGH LOADING ARM AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 010 002
Caption
BARGE LOADED WITH DOE CRUDE OIL AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 009 002
Caption
OVERALL VIEW OF BARGES LOADED WITH DOE CRUDE OIL DOCKED AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 011 005
Caption
MEASUREMENTS BEING TAKEN AT THE FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 012 005
Caption
MEASUREMENTS BEING TAKEN AT THE CRUDE OIL FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 012 005
Caption
MEASUREMENTS BEING TAKEN AT THE CRUDE OIL FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 014 005
Caption
CONTROL ROOM OPERATOR AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT-OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 013 005
Caption
DOE SERVICE SHAFT INTO THE MINE AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 004 005
Caption
VIEW OF A VAST UNDERGROUND CAVERN AT THE STRATEGIC PETROLEUM RESERVE'S WEEKS ISLAND STORAGE SITE IN LOUISIANA.
THE STRATEGIC PETROLEUM RESERVE (SPR) WAS CREATED TO HELP REDUCE THE EFFECTS OF POTENTIAL OIL SUPPLY DISRUPTIONS. STORAGE SITES MUST BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE SPR,AND STORAGE AREAS, SUCH AS THIS ONE AT WEEKS ISLAND, LA, HAVE BEEN CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. DOE'S FY 1986 BUDGET DOCUMENT PROPOSED AN INDEFINITE MORATORIUM ON FURTHER SPR DEVELOPMENT. THE RESERVE, WHICH WILL CONTAIN OVER 489 MILLION BARRELS OF CRUDE OIL BY THE END OF FY 1985, IS TO BE MAINTAINED IN STANDBY READINESS CONDITION.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 005 005
Caption
FRAMEWORK FOR THE NEW HEAD FRAME OVER THE PRODUCTION SHAFT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 006 005
Caption
PIG LAUNCHER/RECEIVER AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 007 005
Caption
CRUDE OIL PUMPS AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 008 005
Caption
GAS RECOVERY UNIT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 009 005
Caption
PROVER LOOP AND METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 028 005
Caption
PRODUCTION SHAFT CONTROL ROOM.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 010 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 004 005
Caption
VIEW OF A VAST UNDERGROUND CAVERN AT THE STRATEGIC PETROLEUM RESERVE'S WEEKS ISLAND STORAGE SITE IN LOUISIANA.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 013 005
Caption
DOE SERVICE SHAFT INTO THE MINE AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN /DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 010 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN /DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 009 005
Caption
PROVER LOOP AND METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL
.For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 008 005
Caption
GAS RECOVERY UNIT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 027 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 026 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
Strategic Petroleum Reserve 2011 Drawdown Team
Caption
Awardees (not all pictured): Jorge Aguinaga, Racheal P. Baldwin, Lansen C. Barrow, Michael Corule, Gary F. Durel, Patricia C. Ehrle, Julianna R. Gallego, Kelley M. Gele
Lionel J. Gele, Jr., William C. Gibson, Jr., Ralph R. Habbaz, Nathan T. Harvey, Marshall, B. Jackson, David F. Johnson, Robert J. Kahl III, Allison W. Kuhn, Nancy T. Marland, Michael E. McWilliams, Lindsa Partusch-Goldstein, Anthony Earl Pate, John M. Powell, Anne M. Quern, James M. Quern, Grant G. Rivera, Suresh M. Sevak, Nabil A. Shourbaji, George R. Shutt, Sheldra A. Wormhoudt. The Strategic Petroleum Reserve 2011 Drawdown Team is recognized for exemplary performance in the successful sale, drawdown and delivery of 30 million barrels of crude oil from the Strategic Petroleum Reserve after the President ordered a drawdown of the Reserve to join the International Energy Agency’s collective response to the shutdown of Libya's oil industry. The 2011 Strategic Petroleum Reserve drawdown was the largest emergency release of strategic petroleum stocks ever accomplished and was completed on time and without any accidents, environmental incidents, or delivery problems. It was also the first time that the President did not provide a waiver to Jones Act requirements that would have allowed foreign marine vessels to load and deliver the Strategic Petroleum Reserve’s crude oil.
Photo
Photo Title
Prover loop on the meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Prover loop on the meter skid at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Meter skid at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Meter skid, prover loop and pipelines at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Meter skid, prover loop and pipelines at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Brine/raw water line at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Brine/raw water line at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Crude oil, raw water/brine pipes on the high pressure pump pad at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Crude oil, raw water/brine pipes on the high pressure pump pad at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Meter skid at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Raw water pumps on the high pressure pump pad at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Raw water pumps on the high pressure pump pad at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Prover loop on meter skid at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Prover loop on meter skid at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Wellhead at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Wellhead at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Well pad/wellhead and valves at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Well pad/wellhead and valves at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Wellhead over a crude oil storage cavern at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Wellhead over a crude oil storage cavern at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Wellheads at the Bryan Mound site.
Caption
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Wellheads at the Bryan Mound site.
The Bryan Mound Strategic Petroleum Reserve site is located in Brazoria County, Texas, approximately 65 miles south of Houston. Storage facilities provide space for more than 220 million barrels of crude oil in a salt dome that contains 1.5 cubic miles of salt to the 10,500 foot depth level. A 36-inch diameter pipeline carries brine from the leaching process 12.5 miles out into the Gulf of Mexico. Bryan Mound draw down volumes could exceed one million barrels of crude oil per day.
Photo
Photo Title
Secretary of Energy and Russian Minister visiting Bryan Mound site in 2002.
Caption
The United States/Russia Commercial Energy Summit was held in Houston, Texas, October 1-2, 2002. As part of the summit, Secretary Abraham and Russian Minister of Energy Igor Yusufov visited DOE's Strategic Petroleum Reserve Bryan Mound site in Freeport, Texas.
Secretary of Energy and Russian Minister visiting Bryan Mound site in 2002.
The United States/Russia Commercial Energy Summit was held in Houston, Texas, October 1-2, 2002. As part of the summit, Secretary Abraham and Russian Minister of Energy Igor Yusufov visited DOE's Strategic Petroleum Reserve Bryan Mound site in Freeport, Texas.
Photo
Photo Title
Overview of crude oil pumps on the high pressure pump pads at the West Hackberry site.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Overview of crude oil pumps on the high pressure pump pads at the West Hackberry site.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Fresh water tanks at the West Hackberry site.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Fresh water tanks at the West Hackberry site.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Aerial view of the brine pond booster pumps/oil brine separator ponds at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Aerial view of the brine pond booster pumps/oil brine separator ponds at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Aerial of well pad at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Aerial of well pad at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Meter skid at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Meter skid at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Wellhead at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Wellhead at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Wellhead at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Wellhead at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
Crude oil prover loop at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Crude oil prover loop at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
High pressure pump pad at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
High pressure pump pad at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
High pressure pump pad at West Hackberry.
Caption
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
High pressure pump pad at West Hackberry.
West Hackberry, the second largest storage sites in the Strategic Petroleum Reserve, is located in Cameron Parish, Louisiana, in a salt dome that contains 15.1 cubic miles of salt, when measured above the 10,500 foot level. West Hackberry is connected to the Texoma Pipeline, which runs northward to Cushing, Oklahoma, and another existing pipeline distribution network. West Hackberry has a total of 22 storage caverns with a combined capacity to store 227 million barrels of crude oil and can be drawn down at a design rate of 1.4
Photo
Photo Title
228 034 002
Caption
METER SKID AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 034 002
METER SKID AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 033 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 033 002
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 031 002
Caption
PIG LAUNCHER/RECEIVER AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 031 002
PIG LAUNCHER/RECEIVER AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 032 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 032 002
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 030 002
Caption
METER SKID AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 030 002
METER SKID AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 029 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 029 002
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 028 002
Caption
CEMENTED WELL PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 028 002
CEMENTED WELL PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 027 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 027 002
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 026 002
Caption
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 026 002
HIGH PRESSURE PUMP PAD AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 025 002
Caption
RAW WATER PUMP AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 025 002
RAW WATER PUMP AT BAYOU CHOCTAW.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT-WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 057 002
Caption
AERIAL OF WORK OVER RIG ON A BAYOU CHOCTAW WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
228 057 002
AERIAL OF WORK OVER RIG ON A BAYOU CHOCTAW WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/DISTRIBUTION. THE BAYOU CHOCTAW SITE OF THE STRATEGIC PETROLEUM RESERVE IS LOCATED ON ABOUT 400 ACRES, 12 MILES SOUTHWEST OF BATON ROUGE. MORE THAN 50 MILLION BARRELS OF CRUDE OIL WILL BE STORED AT BAYOU CHOCTAW, WITH A DESIGN DRAW DOWN RATE OF MORE THAN 450,000 BARRELS OF CRUDE OIL PER DAY. THE STORAGE SITE IS CONNECTED BY A 36-INCH PIPELINE TO THE ST. JAMES TERMINAL. BRINE FROM LEACHING ACTIVITY AT BAYOU CHOCTAW IS INJECTED DEEP UNDERGROUND IN SALT WATER AQUIFIERS AT A LOCATION ABOUT TWO AND ONE HALF MILES FROM THE STORAGE FACILITY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 001 003
Caption
RAW WATER BOOSTER PUMPS AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 001 003
RAW WATER BOOSTER PUMPS AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 002 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
228 002 003
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
Photo
Photo Title
228 003 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 003 003
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 004 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 004 003
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 007 003
Caption
WELLHEAD AND RIG.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 007 003
WELLHEAD AND RIG.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 005 003
Caption
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 005 003
HIGH PRESSURE PUMP PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 006 003
Caption
WELL HEAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 006 003
WELL HEAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 008 003
Caption
CLOSE-UP OF A WELLHEAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 008 003
CLOSE-UP OF A WELLHEAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 009 003
Caption
WELL HEAD WITH PIPING, WORK OVER RIG AND BLANKET OIL DELIVERY TRUCKS.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 009 003
WELL HEAD WITH PIPING, WORK OVER RIG AND BLANKET OIL DELIVERY TRUCKS.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 010 003
Caption
WELLHEAD AT BIG HILL SPR SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 010 003
WELLHEAD AT BIG HILL SPR SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 011 003
Caption
WELL HEAD WITH MAINTENANCE WORKER.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 011 003
WELL HEAD WITH MAINTENANCE WORKER.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 012 003
Caption
PIPING ON A WELL PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 012 003
PIPING ON A WELL PAD AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 013 003
Caption
CAVERN PIPING ON WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 013 003
CAVERN PIPING ON WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 014 003
Caption
WELLHEAD AT BIG HILL SPR SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 014 003
WELLHEAD AT BIG HILL SPR SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 015 003
Caption
WELL HEAD AND PIPING ON A WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 015 003
WELL HEAD AND PIPING ON A WELL PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 016 003
Caption
WELL PAD PIPING AND WORK OVER RIG AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 016 003
WELL PAD PIPING AND WORK OVER RIG AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 017 003
Caption
RAW WATER INTAKE STRUCTURE AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 017 003
RAW WATER INTAKE STRUCTURE AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 018 003
Caption
RAW WATER INTAKE STRUCTURE AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 018 003
RAW WATER INTAKE STRUCTURE AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 020 003
Caption
HIGH PRESSURE PUMP PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 020 003
HIGH PRESSURE PUMP PAD.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 021 003
Caption
POWER SUB-STATION, MAINTENANCE GARAGE, AND MASTER CONTROL CENTER AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAWDOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 021 003
POWER SUB-STATION, MAINTENANCE GARAGE, AND MASTER CONTROL CENTER AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAWDOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 022 003
Caption
WELL PAD UNDER CONSTRUCTION AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 022 003
WELL PAD UNDER CONSTRUCTION AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 023 003
Caption
WELL PADS WITH FRAC TANKS AND A WORK OVER RIG.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 023 003
WELL PADS WITH FRAC TANKS AND A WORK OVER RIG.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAW DOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 024 003
Caption
WELL PAD UNDER CONSTRUCTION AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAWDOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
228 024 003
WELL PAD UNDER CONSTRUCTION AT BIG HILL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE BIG HILL STORAGE SITE IS LOCATED IN JEFFERSON COUNTY, TEXAS, 20 MILES SOUTH- WEST OF BEAUMONT, AND IS SITUATED ON APPROXIMATELY 275 ACRES OF LAND. THE SURFACE OF THE SALT DOME IS A MOUND RISING 27 FEET ABOVE THE SURROUNDING AREA. THE DOME IS SHAPED LIKE A CYLINDRICAL COLUMN TILTED TO THE SOUTH. THE THICKNESS OF THE CAPROCK VARIES FROM 850 FEET TO 1,350 FEET, MAKING IT ONE OF THE THICKEST KNOWN LAYERS OF CAPROCK OF THE GULF COAST SALT DOMES. THE CAPROCK IS COMPRISED OF LIMESTONE, GYPSUM AND ANHYDRITE. BIG HILL HAS STORAGE CAPACITY OF 160 MILLION BARRELS AND A DRAWDOWN CAPABILITY OF 930,000 BARRELS PER DAY.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 006 002
Caption
Drilling rig at Well 20A. Rig on Well 15A in background.
With a capacity of 727 million barrels, the U.S. Strategic Petroleum Reserve is the largest stockpile of government-owned emergency crude oil in the world. Established in the aftermath of the 1973-74 oil embargo, the SPR provides the President with a powerful response option should a disruption in commercial oil supplies threaten the U.S. economy. It is also the critical component for the United States to meet its International Energy Agency obligation to maintain emergency oil stocks, and provides a national defense fuel reserve.
228 006 002
Drilling rig at Well 20A. Rig on Well 15A in background.
With a capacity of 727 million barrels, the U.S. Strategic Petroleum Reserve is the largest stockpile of government-owned emergency crude oil in the world. Established in the aftermath of the 1973-74 oil embargo, the SPR provides the President with a powerful response option should a disruption in commercial oil supplies threaten the U.S. economy. It is also the critical component for the United States to meet its International Energy Agency obligation to maintain emergency oil stocks, and provides a national defense fuel reserve.
Photo
Photo Title
228 008 002
Caption
PIPING AND BRINE PUMPS FOR INTERIM FILL PHASE II.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 008 002
PIPING AND BRINE PUMPS FOR INTERIM FILL PHASE II.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 005 004
Caption
THE WELL HEAD ON PAD 108 IS THE FIRST ONE BUILT DURING THE EXPANSION AT THE SITE.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT IN AN EMERGENCY, THE OIL COULD BE WITH- DRAW AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
226 005 004
THE WELL HEAD ON PAD 108 IS THE FIRST ONE BUILT DURING THE EXPANSION AT THE SITE.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT IN AN EMERGENCY, THE OIL COULD BE WITH- DRAW AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 005 002
Caption
Pumps on pedestals at high pressure pumping station.
With a capacity of 727 million barrels, the U.S. Strategic Petroleum Reserve is the largest stockpile of government-owned emergency crude oil in the world. Established in the aftermath of the 1973-74 oil embargo, the SPR provides the President with a powerful response option should a disruption in commercial oil supplies threaten the U.S. economy. It is also the critical component for the United States to meet its International Energy Agency obligation to maintain emergency oil stocks, and provides a national defense fuel reserve.
228 005 002
Pumps on pedestals at high pressure pumping station.
With a capacity of 727 million barrels, the U.S. Strategic Petroleum Reserve is the largest stockpile of government-owned emergency crude oil in the world. Established in the aftermath of the 1973-74 oil embargo, the SPR provides the President with a powerful response option should a disruption in commercial oil supplies threaten the U.S. economy. It is also the critical component for the United States to meet its International Energy Agency obligation to maintain emergency oil stocks, and provides a national defense fuel reserve.
Photo
Photo Title
228 004 002
Caption
BRINE RESERVOIR SOUTH OF CAVERN 15.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 004 002
BRINE RESERVOIR SOUTH OF CAVERN 15.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 003 002
Caption
PIPING TO PUMPING STATION FROM BRINE BOOSTER STATION WITH RIG ON WELL 15A IN BACKGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 003 002
PIPING TO PUMPING STATION FROM BRINE BOOSTER STATION WITH RIG ON WELL 15A IN BACKGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 002 002
Caption
LOOKING NORTH AT DRILLING RIG ON WELL NO. 15 WITH BRINE PIPELINE IN FOREGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 002 002
LOOKING NORTH AT DRILLING RIG ON WELL NO. 15 WITH BRINE PIPELINE IN FOREGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 001 002
Caption
WELLHEAD NO. 18 IN FOREGROUND WITH THE DRILLING RIG ON WELL NO. 18A IN BACKGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 001 002
WELLHEAD NO. 18 IN FOREGROUND WITH THE DRILLING RIG ON WELL NO. 18A IN BACKGROUND.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 011 005
Caption
MEASUREMENTS BEING TAKEN AT THE FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 011 005
MEASUREMENTS BEING TAKEN AT THE FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 002 001
Caption
AERIAL VIEW OF THREE (WHITE) DOE CRUDE OIL STORAGE TANKS IN THE FOREGROUND AT THE SUNOCO TERMINAL NEAR NEDERLAND, TX.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
227 002 001
AERIAL VIEW OF THREE (WHITE) DOE CRUDE OIL STORAGE TANKS IN THE FOREGROUND AT THE SUNOCO TERMINAL NEAR NEDERLAND, TX.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 004 001
Caption
CREW INSTALLING SQUEEGEE INTO THE NEW DOE CRUDE OIL 42-INCH PIPELINE NEAR NEDERLAND, TEXAS, TO WEST HACKBERRY, LA.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THE FIRST CRUDE OIL WAS PUMPED IN BEHIND THE WATER FLUSH AND BEGAN CREEPING AT LESS THAN ONE MILE AN HOUR THROUGH THE LINE.
For more information or additional images, please contact 202-586-5251.
227 004 001
CREW INSTALLING SQUEEGEE INTO THE NEW DOE CRUDE OIL 42-INCH PIPELINE NEAR NEDERLAND, TEXAS, TO WEST HACKBERRY, LA.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THE FIRST CRUDE OIL WAS PUMPED IN BEHIND THE WATER FLUSH AND BEGAN CREEPING AT LESS THAN ONE MILE AN HOUR THROUGH THE LINE.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 005 001
Caption
A CREW TURNS ON THE VALVES AT AN OIL TERMINAL NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THIS SENDS CRUDE OIL THROUGH 42-INCH UNDERGROUND PIPELINE EXTENDING 42 MILES SOUTH EAST TO THE DOE WEST HACKBERRY, LA., STORAGE CAVERNS.
For more information or additional images, please contact 202-586-5251.
227 005 001
A CREW TURNS ON THE VALVES AT AN OIL TERMINAL NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THIS SENDS CRUDE OIL THROUGH 42-INCH UNDERGROUND PIPELINE EXTENDING 42 MILES SOUTH EAST TO THE DOE WEST HACKBERRY, LA., STORAGE CAVERNS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 006 001
Caption
PUSHING SQUEEGEE INTO REDUCER FOR LAUNCHING IN THE 42-INCH PIPELINE NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
227 006 001
PUSHING SQUEEGEE INTO REDUCER FOR LAUNCHING IN THE 42-INCH PIPELINE NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 008 001
Caption
DOE 42-INCH PIPELINE PUMP STATION AND MANIFOLD PIPING AT SUNOCO TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
227 008 001
DOE 42-INCH PIPELINE PUMP STATION AND MANIFOLD PIPING AT SUNOCO TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 001 001
Caption
TANKER UNLOADING (DOE) CRUDE OIL (ON THE NATCHEZ RIVER) AT THE SUNOCO TERMINAL NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THE CRUDE IS PUMPED TO DOE STORAGE TANKS AND THEN INTO A 42-INCH PIPELINE TO THE WEST HACKBERRY, LA.,STORAGE CAVERNS.
For more information or additional images, please contact 202-586-5251.
227 001 001
TANKER UNLOADING (DOE) CRUDE OIL (ON THE NATCHEZ RIVER) AT THE SUNOCO TERMINAL NEAR NEDERLAND, TEXAS.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. THE CRUDE IS PUMPED TO DOE STORAGE TANKS AND THEN INTO A 42-INCH PIPELINE TO THE WEST HACKBERRY, LA.,STORAGE CAVERNS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 005 002
Caption
ST. JAMES DOCK #1 - 84 INCH STEEL PILE FOR DOLPHINS ON BRIDGE IN FOREGROUND.
ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS & CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE ST. JAMES TERMINAL IS LOCATED ON ABOUT 173 ACRES OF LAND, 30 MILES SOUTHWEST OF BATON ROUGE, ON THE MISSISSIPPI RIVER. IT IS THE ONLY TERMINAL OWNED BY THE DOE'S STRATEGIC PETROLEUM RESERVES. THE TERMINAL FACILITY HAS TWO DOCKS WHERE LARGE TANKERS UNLOAD CRUDE OIL AND SIX STORAGE TANKS WITH A TOTAL CAPACITY OF 2 MILLION BARRELS. THE TERMINAL CONNECTS VIA PIPELINE TO THE BAYOU CHOCTAW AND WEEKS ISLAND STORAGE SITES.
For more information or additional images, please contact 202-586-5251.
227 005 002
ST. JAMES DOCK #1 - 84 INCH STEEL PILE FOR DOLPHINS ON BRIDGE IN FOREGROUND.
ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS & CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE ST. JAMES TERMINAL IS LOCATED ON ABOUT 173 ACRES OF LAND, 30 MILES SOUTHWEST OF BATON ROUGE, ON THE MISSISSIPPI RIVER. IT IS THE ONLY TERMINAL OWNED BY THE DOE'S STRATEGIC PETROLEUM RESERVES. THE TERMINAL FACILITY HAS TWO DOCKS WHERE LARGE TANKERS UNLOAD CRUDE OIL AND SIX STORAGE TANKS WITH A TOTAL CAPACITY OF 2 MILLION BARRELS. THE TERMINAL CONNECTS VIA PIPELINE TO THE BAYOU CHOCTAW AND WEEKS ISLAND STORAGE SITES.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
227 006 002
Caption
OVERALL VIEW OF THE CRUDE OIL SHORTAGE TANKS AT ST. JAMES TERMINAL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COSTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS & CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE ST. JAMES TERMINAL IS LOCATED ON ABOUT 173 ACRES OF LAND, 30 MILES SOUTHWEST OF BATON ROUGE, ON THE MISSISSIPPI RIVER. IT IS THE ONLY TERMINAL OWNED BY THE DOE'S STRATEGIC PETROLEUM RESERVES. THE TERMINAL FACILITY HAS TWO DOCKS WHERE LARGE TANKERS UNLOAD CRUDE OIL AND SIX STORAGE TANKS WITH A TOTAL CAPACITY OF 2 MILLION BARRELS. THE TERMINAL CONNECTS VIA PIPELINE TO THE BAYOU CHOCTAW AND WEEKS ISLAND STORAGE SITES.
For more information or additional images, please contact 202-586-5251.
227 006 002
OVERALL VIEW OF THE CRUDE OIL SHORTAGE TANKS AT ST. JAMES TERMINAL.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COSTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS & CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. THE ST. JAMES TERMINAL IS LOCATED ON ABOUT 173 ACRES OF LAND, 30 MILES SOUTHWEST OF BATON ROUGE, ON THE MISSISSIPPI RIVER. IT IS THE ONLY TERMINAL OWNED BY THE DOE'S STRATEGIC PETROLEUM RESERVES. THE TERMINAL FACILITY HAS TWO DOCKS WHERE LARGE TANKERS UNLOAD CRUDE OIL AND SIX STORAGE TANKS WITH A TOTAL CAPACITY OF 2 MILLION BARRELS. THE TERMINAL CONNECTS VIA PIPELINE TO THE BAYOU CHOCTAW AND WEEKS ISLAND STORAGE SITES.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 011 002
Caption
WORKER CONTROLS FLOW OF CRUDE OIL THROUGH LOADING ARM AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 011 002
WORKER CONTROLS FLOW OF CRUDE OIL THROUGH LOADING ARM AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 010 002
Caption
BARGE LOADED WITH DOE CRUDE OIL AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 010 002
BARGE LOADED WITH DOE CRUDE OIL AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
228 009 002
Caption
OVERALL VIEW OF BARGES LOADED WITH DOE CRUDE OIL DOCKED AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
228 009 002
OVERALL VIEW OF BARGES LOADED WITH DOE CRUDE OIL DOCKED AT BULL BAY TERMINAL.
THE PURPOSE OF THE STRATEGIC PETROLEUM RESERVES IS TO REDUCE THE NATION'S VULNERABILITY TO A SEVERE SHORTAGE OF PETROLEUM SUPPLY. THE SITES NEED TO BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE THE RESERVES. THE STORAGE AREAS ARE BEING CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 011 005
Caption
MEASUREMENTS BEING TAKEN AT THE FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 011 005
MEASUREMENTS BEING TAKEN AT THE FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 012 005
Caption
MEASUREMENTS BEING TAKEN AT THE CRUDE OIL FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 012 005
MEASUREMENTS BEING TAKEN AT THE CRUDE OIL FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 012 005
Caption
MEASUREMENTS BEING TAKEN AT THE CRUDE OIL FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 012 005
MEASUREMENTS BEING TAKEN AT THE CRUDE OIL FILL HOLE SITE.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 014 005
Caption
CONTROL ROOM OPERATOR AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT-OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 014 005
CONTROL ROOM OPERATOR AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT-OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 013 005
Caption
DOE SERVICE SHAFT INTO THE MINE AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 013 005
DOE SERVICE SHAFT INTO THE MINE AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 004 005
Caption
VIEW OF A VAST UNDERGROUND CAVERN AT THE STRATEGIC PETROLEUM RESERVE'S WEEKS ISLAND STORAGE SITE IN LOUISIANA.
THE STRATEGIC PETROLEUM RESERVE (SPR) WAS CREATED TO HELP REDUCE THE EFFECTS OF POTENTIAL OIL SUPPLY DISRUPTIONS. STORAGE SITES MUST BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE SPR,AND STORAGE AREAS, SUCH AS THIS ONE AT WEEKS ISLAND, LA, HAVE BEEN CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. DOE'S FY 1986 BUDGET DOCUMENT PROPOSED AN INDEFINITE MORATORIUM ON FURTHER SPR DEVELOPMENT. THE RESERVE, WHICH WILL CONTAIN OVER 489 MILLION BARRELS OF CRUDE OIL BY THE END OF FY 1985, IS TO BE MAINTAINED IN STANDBY READINESS CONDITION.
For more information or additional images, please contact 202-586-5251.
226 004 005
VIEW OF A VAST UNDERGROUND CAVERN AT THE STRATEGIC PETROLEUM RESERVE'S WEEKS ISLAND STORAGE SITE IN LOUISIANA.
THE STRATEGIC PETROLEUM RESERVE (SPR) WAS CREATED TO HELP REDUCE THE EFFECTS OF POTENTIAL OIL SUPPLY DISRUPTIONS. STORAGE SITES MUST BE ACCESSIBLE TO TANKERS AND PIPELINES SO THAT, IN AN EMERGENCY, THE OIL COULD BE WITHDRAWN AND ENTERED INTO THE NORMAL DISTRIBUTION SYSTEM. THE GULF COAST HAS THE PORTS, REFINERIES, AND PIPELINES TO ACCOMMODATE SPR,AND STORAGE AREAS, SUCH AS THIS ONE AT WEEKS ISLAND, LA, HAVE BEEN CONSTRUCTED UNDERGROUND IN SALT DOMES ALONG THE TEXAS AND LOUISIANA COASTS. DOE'S FY 1986 BUDGET DOCUMENT PROPOSED AN INDEFINITE MORATORIUM ON FURTHER SPR DEVELOPMENT. THE RESERVE, WHICH WILL CONTAIN OVER 489 MILLION BARRELS OF CRUDE OIL BY THE END OF FY 1985, IS TO BE MAINTAINED IN STANDBY READINESS CONDITION.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 005 005
Caption
FRAMEWORK FOR THE NEW HEAD FRAME OVER THE PRODUCTION SHAFT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 005 005
FRAMEWORK FOR THE NEW HEAD FRAME OVER THE PRODUCTION SHAFT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 006 005
Caption
PIG LAUNCHER/RECEIVER AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 006 005
PIG LAUNCHER/RECEIVER AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 007 005
Caption
CRUDE OIL PUMPS AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 007 005
CRUDE OIL PUMPS AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 008 005
Caption
GAS RECOVERY UNIT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 008 005
GAS RECOVERY UNIT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 009 005
Caption
PROVER LOOP AND METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 009 005
PROVER LOOP AND METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 028 005
Caption
PRODUCTION SHAFT CONTROL ROOM.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 028 005
PRODUCTION SHAFT CONTROL ROOM.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 010 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 010 005
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 004 005
Caption
VIEW OF A VAST UNDERGROUND CAVERN AT THE STRATEGIC PETROLEUM RESERVE'S WEEKS ISLAND STORAGE SITE IN LOUISIANA.
For more information or additional images, please contact 202-586-5251.
226 004 005
VIEW OF A VAST UNDERGROUND CAVERN AT THE STRATEGIC PETROLEUM RESERVE'S WEEKS ISLAND STORAGE SITE IN LOUISIANA.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 013 005
Caption
DOE SERVICE SHAFT INTO THE MINE AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN /DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 013 005
DOE SERVICE SHAFT INTO THE MINE AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN /DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 010 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN /DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 010 005
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN /DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 009 005
Caption
PROVER LOOP AND METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL
.For more information or additional images, please contact 202-586-5251.
226 009 005
PROVER LOOP AND METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL
.For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 008 005
Caption
GAS RECOVERY UNIT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 008 005
GAS RECOVERY UNIT AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS AND LOUISIANA AND A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA, AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 027 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 027 005
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
226 026 005
Caption
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
226 026 005
METER SKID AT WEEKS ISLAND.
SINCE 1976, THE DEPARTMENT OF ENERGY HAS BEEN INVOLVED IN A MAJOR FACILITIES DEVELOPMENT PROGRAM TO STOCKPILE CRUDE OIL. THE STRATEGIC PETROLEUM RESERVE FACILITY PROGRAM HAS FIVE UNDERGROUND CRUDE OIL STORAGE FACILITIES IN SALT DOMES ALONG THE GULF COASTS OF TEXAS & LOUISIANA & A GOVERNMENT- OWNED MARINE TERMINAL ON THE MISSISSIPPI RIVER AT ST. JAMES, LOUISIANA. THE FIVE STORAGE SITES ARE BAYOU CHOCTAW, WEEKS ISLAND, WEST HACKBERRY IN LOUISIANA AND BRYAN MOUND AND BIG HILL IN TEXAS. THESE FIVE STORAGE SITES ARE ORGANIZED INTO THREE DISTRIBUTION SYSTEMS AND CONNECTED BY DOE PIPELINES TO COMMERCIAL CRUDE OIL PIPELINE NETWORKS AND MARINE TERMINAL FACILITIES FOR DRAW DOWN/ DISTRIBUTION. WEEKS ISLAND IS A COASTAL "ISLAND" LOCATED IN SOUTH CENTRAL LOUISIANA, APPROXIMATELY 95 MILES SOUTHWEST OF NEW ORLEANS. THE WEEKS ISLAND STRATEGIC PETROLEUM RESERVE SITE IS THE ONLY SITE WHERE CRUDE OIL IS STORED IN AN UNDERGROUND SALT MINE, ACQUIRED FROM MORTON SALT COMPANY. A SYSTEM OF UNDERGROUND ROOMS AND CORRIDORS EXCAVATED FOR THE COMMERCIAL PRODUCTION OF SALT WAS SEALED OFF BY SPR, IT PROVIDES STORAGE SPACE FOR 75 MILLION BARRELS OF CRUDE OIL. WEEKS ISLAND IS CONNECTED TO ST. JAMES VIA A 36-INCH PIPELINE THAT TRAVERSES THE 69 MILES EASTWARD TO ST. JAMES TERMINAL.
For more information or additional images, please contact 202-586-5251.
Photo
Photo Title
Strategic Petroleum Reserve 2011 Drawdown Team
Caption
Awardees (not all pictured): Jorge Aguinaga, Racheal P. Baldwin, Lansen C. Barrow, Michael Corule, Gary F. Durel, Patricia C. Ehrle, Julianna R. Gallego, Kelley M. Gele
Lionel J. Gele, Jr., William C. Gibson, Jr., Ralph R. Habbaz, Nathan T. Harvey, Marshall, B. Jackson, David F. Johnson, Robert J. Kahl III, Allison W. Kuhn, Nancy T. Marland, Michael E. McWilliams, Lindsa Partusch-Goldstein, Anthony Earl Pate, John M. Powell, Anne M. Quern, James M. Quern, Grant G. Rivera, Suresh M. Sevak, Nabil A. Shourbaji, George R. Shutt, Sheldra A. Wormhoudt. The Strategic Petroleum Reserve 2011 Drawdown Team is recognized for exemplary performance in the successful sale, drawdown and delivery of 30 million barrels of crude oil from the Strategic Petroleum Reserve after the President ordered a drawdown of the Reserve to join the International Energy Agency’s collective response to the shutdown of Libya's oil industry. The 2011 Strategic Petroleum Reserve drawdown was the largest emergency release of strategic petroleum stocks ever accomplished and was completed on time and without any accidents, environmental incidents, or delivery problems. It was also the first time that the President did not provide a waiver to Jones Act requirements that would have allowed foreign marine vessels to load and deliver the Strategic Petroleum Reserve’s crude oil.
Strategic Petroleum Reserve 2011 Drawdown Team
Awardees (not all pictured): Jorge Aguinaga, Racheal P. Baldwin, Lansen C. Barrow, Michael Corule, Gary F. Durel, Patricia C. Ehrle, Julianna R. Gallego, Kelley M. Gele
Lionel J. Gele, Jr., William C. Gibson, Jr., Ralph R. Habbaz, Nathan T. Harvey, Marshall, B. Jackson, David F. Johnson, Robert J. Kahl III, Allison W. Kuhn, Nancy T. Marland, Michael E. McWilliams, Lindsa Partusch-Goldstein, Anthony Earl Pate, John M. Powell, Anne M. Quern, James M. Quern, Grant G. Rivera, Suresh M. Sevak, Nabil A. Shourbaji, George R. Shutt, Sheldra A. Wormhoudt. The Strategic Petroleum Reserve 2011 Drawdown Team is recognized for exemplary performance in the successful sale, drawdown and delivery of 30 million barrels of crude oil from the Strategic Petroleum Reserve after the President ordered a drawdown of the Reserve to join the International Energy Agency’s collective response to the shutdown of Libya's oil industry. The 2011 Strategic Petroleum Reserve drawdown was the largest emergency release of strategic petroleum stocks ever accomplished and was completed on time and without any accidents, environmental incidents, or delivery problems. It was also the first time that the President did not provide a waiver to Jones Act requirements that would have allowed foreign marine vessels to load and deliver the Strategic Petroleum Reserve’s crude oil.