Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, New Mexico
Mesaba Energy Project, Itasca, Minnesota
Site Selection for the Expansion of the Strategic Petroleum Reserve
Orlando Gasification Project, Orlando, FL
Chief Joseph Dam Hatchery Program
Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota
Disposal of Greater-Than-Class C Low-Level Radioactive Waste
Rebuild of the Libby (FEC) to Troy Section of BPA’s Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana
EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line