July 27, 2012
DOE/EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement (July 27, 2012)
Surplus Plutonium Disposition
July 25, 2012
DOE/EIS-0283-S2: Draft Supplemental Environmental Impact Statement (July 2012)
Surplus Plutonium Disposition
June 26, 2012
DOE/EIS-0283-S2: Interim Action Determination (June 26, 2012)
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (Use of H-Canyon/HB-Line to Prepare Feed for the Mixed Oxide Fuel Fabrica...
January 12, 2012
DOE/EIS-0283-S2: Second Amended Notice of Intent (January 12, 2012)
Surplus Plutonium Disposition Supplemental Environmental Impact Statement
October 17, 2011
DOE/EIS-0283-S2: Interim Action Determination (April 1, 2011; Disposition of Certain Plutonium Materials)
Disposition of Certain Plutonium Materials Stored at the Savannah River Site
April 1, 2011
DOE/EIS-0283-S2: Interim Action Determination (April 1, 2011; Flexible Manufacturing Capability for the MFFF)
Flexible Manufacturing Capability for the Mixed Fuel Fabrication Facility (MFFF)
March 30, 2011
DOE/EIS-0283-S2: Amended Interim Action Determination (March 2011)
Disposition of Plutonium Materials from the Department of Energy Standard 3013 Surveillance Program at the Savannah River Site (Amending Interim Action Determination of 12/08/2008)
July 19, 2010
September 25, 2009
DOE/EIS-0283-S2: Interim Action Determination (September 25, 2009)
Processing of Plutonium Materials in H-Canyon at the Savannah River Site
December 8, 2008
DOE/EIS-0283-S2: Interim Action Determination (December 8, 2008)
Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site