Finding of no significant impact (March 6, 2021) for the Sterling Solar 2 Interconnection Project (DOE/EA-2141) in Arizona.
Final EA (March 2021) for the Sterling Solar 2 Interconnection Project (DOE/EA-2141) in Arizona.
Draft EA (October 2020) for the Sterling Solar 2 Interconnection Project (DOE/EA-2141) in Arizona.