Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guy wires at speci…
The U.S. Department of Energy (DOE), Hanford Field Office (HFO), manages approximately 580 square miles comprising the Hanford Site, which is locat…
Bonneville Power Administration (BPA) proposes to fund the Washington Department of Fish and Wildlife (WDFW) to conduct ongoing maintenance activit…
The Bonneville Power Administration (BPA) proposes to fund the Yakama Nation Klickitat Fisheries Project (YKFP) to implement pre-project studies fo…
The Klickitat will upgrade approximately 3,500 feet of old, outdated single phase distribution line to an underground three phase line. These upgra…
Bonneville Power Administration (BPA) is proposing to replace two deteriorating wood pole structures on the Keller Tap to Grand Coulee-Okanogan No.…
Bonneville Power Administration (BPA) proposes to allow Verizon to establish a new wireless telecommunications site (Tacoma Crest) on structure 19/…
The Klickitat PUD will upgrade approximately 7.5 miles of old, outdated poles, some dating back to 1947. The current poles will be replaced with ta…
The Klickitat PUD will upgrade approximately 8,500 feet of old, outdated single phase distribution line to three phase line. These upgrades include…
Site work to prep area for substation construction, including grading, stormwater, erosion control, material import, and compaction, ground grid in…