BPA proposes to allow US Gypsum to install ground wire along an existing gas pipeline on BPA ROW that parallels BPA’s Paul-Allston No. 1 transmiss…
BPA proposes to replace the dead end tower insulators on both Chief Joseph-Snohomish No.3 and No. 4 transmission lines. …
BPA proposes to upgrade two radio station sites with new antennas and equipment. …
BPA proposes to fund to the Confederated Tribes of the Umatilla Indian Reservation for restoration activities in a one-mile stretch of the North Fo…
BPA proposes to continue annual funding the Washington Department of Fish and Wildlife for Operations and Maintenance of the Asotin Creek Wildlife …
BPA preposes to replace deteriorating wood pole structures and any associated hardware and guys in the Olympia TLM Maintenance District.…
BPA proposes to fund Washington Department of Fish and Wildlife operations and maintenance at six wetland enhancement sites. …
BPA would allow Snohomish PUD to remove a microwave radio waveguide and dish at the BPA Snohomish substation.…
Sub-yearling (juvenile) assessments to detect natural recruitment, evaluate the conservation aquaculture program, estimate survival, and assess...
BPA proposes to attach new conductors to Midstate Electric Cooperatives’ new transmission line structures located outside of the BPA La Pine substa…