H-Area Vehicle Barrier Installation CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Elevated Fire Water Storage Tank CX(s) Applied: B2.5Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
SRNL C-041 Control Room Alarms (CHEX, OGE, CE) Upgrade (Wireless) CX(s) Applied: B1.3Date: 41858 Location(s): South CarolinaOffices(s): Savannah River Operations Office
SRNL C-041 Control Room Alarms (CHEX, OGE, CE) Upgrade (Wireless) CX(s) Applied: B1.3Date: 41858 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1Date: 41855 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1Date: 41855 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 225-9H CX(s) Applied: B1.3Date: 41852 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Floor Repair in Select Reactor Offices and Admin. Trailer 704-27L CX(s) Applied: B1.3, B1.16Date: 41852 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Spray Herbicide on 105-P & 105-R Roofs CX(s) Applied: B1.3Date: 41852 Location(s): South CarolinaOffices(s): Savannah River Operations Office