Relocate 108-1K Compressed Air System Oil / Water Separator Tank to Allow Improved Condensate Drainage CX(s) Applied: B2.1Date: 08/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
735-A, D-Wing, Main Floor - ARGUS and ANSUL Halon Suppression Systems Replacement CX(s) Applied: B2.5Date: 08/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Developing Accelerated Test Protocols for Improving Robustness, Reliability, and Endurance of SOFC Cells CX(s) Applied: A9, B3.6Date: 08/11/2015 Location(s): South CarolinaOffices(s): National Energy Technology Laboratory
785-6A Outside Painting Exterior Equipment and Safety Items CX(s) Applied: B1.3Date: 08/07/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Developing and Testing Radiation Resistant High Density Foam CX(s) Applied: B3.6Date: 08/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dissolution of U Metal Samples CX(s) Applied: B3.6Date: 08/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
SRNL Tritium Study at B-Area Labs CX(s) Applied: B3.6Date: 07/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of ELE Permeameter CX(s) Applied: B3.6Date: 07/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Modification of Mixed Additive (MAK) Piping System for Direct Antifoam Addition CX(s) Applied: B1.3Date: 07/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Western Sector Treatment System (WSTS) Maintenance Activities CX(s) Applied: B1.3Date: 07/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office