DWPF Process Simulation CX(s) Applied: B3.6Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
151-1L Substation/switchgear Replacement CX(s) Applied: B1.3Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Upgrade DWPF Personnel Accountability System (DPAS) and Guard Houses CX(s) Applied: B1.15Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Upgrade Gamma Isotopic Counter in KAC MSA CX(s) Applied: B2.2Date: 10/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacing Carpet & Tile Associated with RPD Offices in KAC Personnel Wing CX(s) Applied: B1.3Date: 10/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Section E B-Block Cell Windows 10-12 Replacement CX(s) Applied: B2.1Date: 10/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hanford High Level Waste Melter Riser Crystal Settling Test CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Density Determination by Gas Displacement Picnometry CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Glovebox, LAB-GB-52-A CX(s) Applied: B1.3Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Renovation of 773-A Lab B-114 CX(s) Applied: B1.31Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office