Subtask 2.1 – Pathway to Low-Carbon Lignite Utilization CX(s) Applied: A9, B3.6Date: 08/25/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Subtask 4.1 - Strategic Studies CX(s) Applied: A9, A11, B3.1Date: 07/30/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Demonstration of Flare Gas to Electric Power Using Organic Ranking Cycle Generation CX(s) Applied: B3.6Date: 07/28/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test CX(s) Applied: A9, B3.6, B4.6Date: 07/22/2015 Location(s): North DakotaOffices(s): National Energy Technology ...
Task 6 - Management and Reporting CX(s) Applied: A1, A9, A11Date: 07/22/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Interfacing MFIX with PETSc and HYPRE Linear Solver Libraries CX(s) Applied: A9Date: 07/21/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Fullerton Tap CX(s) Applied: B4.11Date: 07/15/2015 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Towner Switchyard Construction CX(s) Applied: B4.11Date: 06/08/2015 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources CX(s) Applied: A1, A9, A11Date: 04/07/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Subtask 2.20: EERC Evaluation of Tight Oil Formations CX(s) Applied: A9, B3.6 Date: 05/08/2014 Location(s): North Dakota Offices(s): National Energy Technology Laboratory