Remove the three phase overhead power line located on the East side of US-75 from the service pole for One Fire Casino, North to the intersection o…
Install five (5) new monitoring and control points on existing utility poles in existing ROW.…
Rebuild three-phase Duke Energy line in existing ROW. Cut 1.1 miles of ROW along West McConnells HWY and install new single phase phase pole line …
Purchase of enhanced resiliency insulators and storm-hardened metal poles…
Installation of new equipment on existing poles that will allow a self healing network to automatically isolate and restore power, within seconds, …
Conversion of 4.0 miles of existing overhead distribution line from three-phase 4/0 ACSR to 477 ACSR on wooden poles using a spacer cable support s…
Replacing aging overhead backlot conductor with front lot underground.…
Installation of remotely controlled electronic recloser on the distribution system.…
Mainline sectionalizing across 11 substations. Testing and replacement of 20 underground cables and 4kV upgrades in residential areas. …
Projects are related with utilization and conversion carbonaceous feedstock (like coal, biomass) using thermo-chemical technologies (like gasificat…