The specific objective of the project is to complete design, specification, engineering, procurement, manufacturing, quality assurance, testing, an…
Bonneville Power Administration (BPA) proposes to expand Salmon River Electric Cooperative, Inc.’s (Salmon River Electric) Spar Canyon substation l…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Coeur d’Alene Tribe to install a rooftop solar photovoltaic (PV) system …
The scope of this task is to upgrade MFC-796 (referred to herein as the facility) and MFC-782 as a part of the MFC Fabrication Process Improvement …
Bonneville Power Administration (BPA) proposes to fund Idaho Fish and Game to construct and replace four fish screens on private lands in the Upper…
This proposed project will modify the plant protective system (PPS) in Advanced Test Reactor (ATR) to allow operation of lobe powers from 60 MW up …
The project has decided that the use of pole-mounted fiber is better suited for the area.…
Site potable water will be plumbed from the underground main or MFC-788 and run underground to a connection in TR-52. Sewer from TR-52 will be run …
Project scope includes experiment design, analyses, hardware fabrication, fuel specimen fabrication, irradiation, and post-irradiation examination …
BPA proposes to fund the Idaho Department of Fish and Game to decommission and obliterate two existing irrigation ditches that divert water from th…