This revision includes additional nearby locations for the placement of the existing two test generators (testing exemption – no APAD required) to …
For the Fiscal Year (FY)-24, INL’s LDRD program focuses on the laboratory’s five strategic initiatives: INL’s three emerging core capabilities, one…
As part of the ATR electrical system upgrades, the 670 -M-42 and M-43 Diesel Generators (50 yrs old) are to be replaced and relocated to the area…
BPA proposes to fund the Shoshone-Paiute Tribe to install two 24-inch diameter culverts at existing unimproved vehicle fords in Warm Springs Creek …
This revision includes the updated facility number, floorplan, and additional projects that will be transferred to the Lindsay Blvd Complex (IF-695…
An N and HS Sponsor requires a remote communications facility for testing and training at Cell Site 6 - INL/CITRC/ARA (43032'00"N 112049'50"W). The…
The scope of this effort includes installation of a new generator, the associated support systems required for operation (cooling, lube oil, fuel, …
BPA would be selling the East Hills Substation to South Side Electric. The new change of ownership at East Hills Substation would be the point at …
Bonneville Power Administration (BPA) proposes to install a new communications tower at the summit of Grouse Peak in Custer County, Idaho. BPA is c…
The Radiological Response Training Range (RRTR) was established to allow first response entities to exercise tactics, techniques, and procedures in…