The objective of the proposed project is to expose surrogate materials (aluminides of zirconium, molybdenum and gadolinium) to pure hydrogen, both …
Revision 1 changes the ECP to a first tier to address the offsite testing at Advanced Cooling Technologies, Inc. (ACT), of components fabricated at…
Northern States Power Company, in collaboration with Xcel Energy and the Idaho National Laboratory (INL) proposes to perform a High-Temperature Ste…
The High-Burnup Experiments in Reactivity-Initiated Accidents (HERA) experiments consists of performing in-pile reactivity-initiated accident (RIA)…
The Analytical Laboratory (AL) is planning to refurbish lab space B-148, including the installation of new laboratory equipment…
This revision addresses new proposed locations for excess soil placement. …
The proposed project would install a six ft. tall chain link fence around the structure.…
The computer room air conditioning (CRAC) system located in IF-616 (WCB) room 126H is old and needs to be replaced with an up-to-date system.…
The Electric Power Research Institute (EPRI), in collaboration with BWXT Nuclear, PTR-Precision Technologies, Bridger Welding Engineering, Rusach I…
The project involves modifying a bus and transferring it to the Disaster Response Complex (DRC) which is a first responder training venue being dev…