The scope of this task is to upgrade MFC-796 (referred to herein as the facility) and MFC-782 as a part of the MFC Fabrication Process Improvement …
This proposed project will modify the plant protective system (PPS) in Advanced Test Reactor (ATR) to allow operation of lobe powers from 60 MW up …
The project has decided that the use of pole-mounted fiber is better suited for the area.…
Site potable water will be plumbed from the underground main or MFC-788 and run underground to a connection in TR-52. Sewer from TR-52 will be run …
Project scope includes experiment design, analyses, hardware fabrication, fuel specimen fabrication, irradiation, and post-irradiation examination …
Research and Development activities at the WRTTF East Test Pad are expected to increase in the future and infrastructure improvements to the facili…
This project is a continuation of prior work to develop a fogged or sprayed fixative for entraining airborne particulates and affixing them to surf…
The INL Fire Department (FD) has been given permission to use building TAN-610 for training purposes.…
The proposed project will lead to the understanding of the ground-state properties of this material that can be extended to other correlated actini…
A Gas Cylinder Storage Area for non-flammable gas cylinders will provide an area of accessibility close to the back door of building stairwell and …