MSA Annual Categorical Exclusion for Transfer Actions CX(s) Applied: B1.30Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Training Exercises and Simulations CX(s) Applied: B1.2Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Electronic Equipment CX(s) Applied: B1.7Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-840: Export Water Line Replacement, 2901Y to 200W CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Asbestos Removal CX(s) Applied: B1.16Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Routine Maintenance CX(s) Applied: B1.3Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 41849 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office