Advancement of the Kinetic Hydropower System to Department of Energy Technology Readiness Level 7/8 CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): New York, Connecticut, New York, Colorado Offices(s): Golden Field Office
Wyandotte Integrated Renewable Energy Strategy 2 CX(s) Applied: A9 Date: 11/20/2013 Location(s): Michigan Offices(s): Golden Field Office
Minto Lodge Rehabilitation CX(s) Applied: B5.1 Date: 11/19/2013 Location(s): Alaska Offices(s): Golden Field Office
Evaluating the Potential for Marine and Hydrokinetic Devices to Become Artificial Reefs of Fish Aggregating Devices Based on Analysis of Surrogates in Tropical, Subtropical and Temperate United States West Coast and Hawaiian Coastal Waters CX(s) Appli...
Marine and Hydrokinetic Environmental Effects Assessment and Monitoring CX(s) Applied: A9 Date: 11/14/2013 Location(s): California, Hawaii Offices(s): Golden Field Office
Apel Steel Corporation CX(s) Applied: B5.16 Date: 11/07/2013 Location(s): Alabama Offices(s): Golden Field Office
Development and Demonstration of Self-Expanding Well Construction CX(s) Applied: A9, B3.6 Date: 11/06/2013 Location(s): Texas Offices(s): Golden Field Office
Scalable Low-head Axial-type Venturi-flow Energy Scavenger CX(s) Applied: B5.24 Date: 11/05/2013 Location(s): New Mexico Offices(s): Golden Field Office
Power Take-off System for Marine Renewable Devices CX(s) Applied: A9, B3.6 Date: 10/23/2013 Location(s): Maryland, Maine Offices(s): Golden Field Office
Transforming Photovoltaic Installations Toward Dispatchable, Schedulable Energy Solutions CX(s) Applied: B3.6, B5.15 Date: 10/17/2013 Location(s): Oregon Offices(s): Golden Field Office