Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …
Treatability Study in D-area to support D-Area Groundwater Remediation…
The proposed action is for the closure of two underground storage tanks.…
A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Soil Neutralization Amendments for the D-Area Coal Storage Area…
A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
A Non-Time Critical (NTC) Removal Action will be conducted for the C-Area Groundwater (CAGW) Operable Unit (OU) TCE plume. The NTC Removal Action w…
Excavate 16,820 m3 (22,000 yd3) of ash and contaminated soil media from the boundary of the P-Area Ash Basin to the edge of the 30-m (100-ft) buffe…