There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
Pipeline routing modifications to the export, sanitary, and raw water systems in 200 West Area of the Hanford Site…
There are five projects proposed as Supplemental Environmental Projects to settle the penalty for failing to initiate treatment of sodium bearing w…
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Project L-840: Export Water Line Replacement, 2901Y to 200W CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Carbon Dioxide Capture By Cold Membrane Operation with Actual Coal-Fired Power Plant Flue Gas CX(s) Applied: A1, A9, B3.6, B5.5 Date: 01/28/2014 Location(s): CX: none, Delaware, Alabama, Pennsylvania, California Offices(s): National Energy Technology ...