Funding will support the project team's small-scale research and development of a long-term energy storage technology for use within inactive upstr…
Coil tubing cleanout of the West Hackberry SPR brine disposal wells.…
The CFA-1710 LNG-CNG System was installed on the east side of the Big Shop (CFA-696) parking lot in 2001 to enable some of the INL fleet to run on …
A science based field laboratory in the Eagle Ford Shale formation will investigate (1) a Refracturing Stage, a Stimulations Stage, and a Gas-Enhan…
This document covers the support activities of equipment rental, purchase of materials, and services under FFPO supervision for oil caverns and bri…
Workover (operations to restore production, such as deepening, plugging back, pulling and resetting lines, and squeeze cementing) of existing wells (including, but not limited to, activities associated with brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, oil) to restore functionality,
Lab evaluation of foam-based conformance control for injected hydrocarbon gases, core flooding, numerical simulation, field test of foam assisted h…
Categorical Exclusion Determination