BPA proposes to disassemble and remove the Big Eddy Direct Current Test Line because the de-energized transmission line is no longer in service. …
BPA proposes to remove the Big Eddy-Celilo No. 3 and No. 4 transmission lines that run between the Big Eddy Substation and the Celilo DC Converter …
MSA/HMIS to perform deactivation, dismantling, and removal of electric transmission facilities (including, but not limited to, electric powerlines,…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment, transmission towers, and auxiliary e…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment,transmission towers, and auxiliary elec…
The Power Management organization at Idaho National Laboratory (INL) must perform timely maintenance and inspection activities on power poles andst…
The Power Management organization at Idaho National Laboratory (INL) needs to perform maintenance and inspection activities on power poles andstruc…
The Mission Support Contractor (MSC) and its subcontractors perform deactivations, dismantling, and removal of electric transmission facilities (in…
Bonneville Power Administration (BPA) proposes to bypass and eventually decommission Silver Bow Substation. The proposed project is necessary becau…
This revision adds new poles at CITRC on circuit 54. Poles will be: 54-26A-1, 54-9-4-3 and 54-9-4-4.…