Chemical Looping Combustion Technology with carbon dioxide Capture for New and Existing Coal-Fired Power Plants - Phase One CX(s) Applied: A9, B3.6 Date: 09/13/2012 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Chemical Looping Combustion Technology with carbon dioxide Capture for New and Existing Coal-Fired Power Plants - Phase One CX(s) Applied: B3.6 Date: 09/13/2012 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Controls on Methane Expulsion During Melting of Natural Gas Hydrate Systems CX(s) Applied: B3.6 Date: 09/12/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Water Management in Mature Oil Fields Using Advanced Particle Gels CX(s) Applied: A9, B3.6 Date: 09/12/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Oxy-Fired Pressurized Fluidized Bed Combustor Development and Scale-Up for New and Retrofit CX(s) Applied: A9, B3.6 Date: 09/11/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Battery Management System with Distributed Wireless Sensors CX(s) Applied: B3.6Date: 09/11/2012 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
(0675 -1537) Utah State University - Robust Cell-Level Modeling and Control of Large Battery Packs CX(s) Applied: B3.6 Date: 09/11/2012 Location(s): Utah, Colorado, Colorado, Colorado Offices(s): Advanced Research Projects Agency-Energy
(0675-1578) Robert Bosch LLC - Advanced Battery Management System CX(s) Applied: B3.6 Date: 09/11/2012 Location(s): California, Michigan, California Offices(s): Advanced Research Projects Agency-Energy
(0675-1534) GE Global Research - Control Enabling Solutions with Ultrathin Strain and Temperature Sensor System for Reduced Battery Life Cycle Cost CX(s) Applied: B3.6 Date: 09/11/2012 Location(s): New York, Michigan, Michigan Offices(s): Advanced Res...
Halide and Oxy-Halide Eutectic Systems for High Performance High Temperature Heat Transfer Fluids CX(s) Applied: B3.6 Date: 09/10/2012 Location(s): Arizona Offices(s): Golden Field Office