Activities include standard office and clerical work and also the research and development of a methane mitigator system within the laboratory, inc…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting intostainle…
B3 Reactor Laboratory permits the operation of three reactor systems. High Performance Reactor 1, High Performance Reactor 2, and the Multi Impurit…
The project aims to deliver a safe, effective, low cost solution to assist with the monetization of economically stranded resources via subsea well…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…
This environmental checklist (EC) covers one experiment module configuration to house the seven fuel pin bundle. This bundle configuration serves a…
The purpose of this revision is to capture additional detail regarding the standard beryllium placed in the I-Loop to moderate neutron flux. The Ad…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…
Award Number: DE-EE0008834, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office