This project is planned to focus on addressing two of the knowledge gaps in severe accident analysis and management identified in the aftermath of …
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.6, NREL, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0008904, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0008970, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): OH, Office(s): Golden Field Office
CX-101705: PURE HYDROGEN PRODUCTION THROUGH PRECIOUS-METAL-FREE MEMBRANE ELECTROLYSIS OF DIRTY WATER
Award Number: DE-EE0008841, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0007613, CX(s) Applied: A9, A11, B1.31, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0008973, CX(s) Applied: A9, B3.6, B3.15, Solar Energy Technologies Office, Location(s): AZ, Office(s): Golden Field Office
Award Number: DE-EE0008991, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): AZ, Office(s): Golden Field Office
Award Number: DE-EE0009029, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
The objectives of the project are to design, build, and test a high-pressure linear motor leak recovery compressor for cost effective recovery of m…