The filtration rate at the Salt Waste Processing Facility (SWPF) has been significantly less than the design target. Savannah River Mission Complet…
Maintenance on equipment and leaks repair for MK-18A located in building 773-A shielded cells.…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
Purify solutions of dissolved actinides using ion exchange, valence adjustment, precipitation, filtration, and calcination.…
Clean and repaint the service bridge at 686-G, Steel Creek Dam.…
This activity is to provide high sensitivity analyses of samples from on and off site locations. These analyses are in support of site characteriza…
Pilot-scale deployment of olivine onto agricultural fields in central Mississippi for CO2 removal from the atmosphere through an Enhanced Rock Weat…
IID will advance and deploy an Advanced Distribution Management System (ADMS) system, which will integrate multiple elements of IID's existing oper…
Chiller systems used to regulate the temperature of R and D instrumentation/devices require a coolant for proper operation. Multiple chillers withi…
The operation of Tuttnauer Model 2840ELP Benchtop Autoclave for the steam sterilization of dry and liquid material in support of biological R and D…