The objective of Phase III is construction and operation phase of the MTR membrane capture system.…
Fundamental lab-scale experiments will be performed at U. of Central Florida and Purdue. …
Admin, office and project mgmt activities; computer modeling, simulation analysis, data analysis, engineering and design of field instrumentation; …
INL proposes to modify the Zero Power Physics Reactor (ZPPR) cell.…
Computational simulation of injector designs and testing of designs based on design rules established with simulations.…
Design and installation of pilot EDR system to treat grey water for reuse at Nebraska Public Power District's coal-fired Gerald Gentleman Station.…
Routine electrical and mechanical fabrication, assembly, testing, installation, operation, and maintenance activities performed by R and D Engineer…
Hands-on fabrication activities covering the assembly of equipment and systems designed by the Energy Security and Engineering Department for SRNS,…
781-A has been has been renovated to accommodate the projects previously being completed in 305-A.…
The objective of this study is to better understand the mechanisms of iodine attenuation in wetland soils.…