Bench-scale studies, and design, engineering, fabrication and demonstration of a first-of-a-kind (FOAK) 100-kW flow electrolyzer for simultaneous a…
Assess the feasibility of volume, long-term storage of hydrogen in the subsurface through data collection
1) Studying composition of biomass ash and building a prototype for biomass ash leaching Optimization of biomass ash leaching building a prototype…
A prototype vapor recovery device will be tested using a mix of gases including propane to assess material balance and operational conditions for t…
A new Isolator Inert Glovebox (GB) and supporting gas services are to be installed in Building 723-15A, Metal Printing Laboratory. It will be used …