Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
Project's primary objective is site characterization including water sample collection, drilling a USDW well, and aerial studies (Subtasks 4.7, 4.8…
Project management, permitting, NEPA and site characterization for CarbonSAFE Ph III project.…
The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) is proposing to use uncrewed aircraft systems (UAS) to collect da…
This Amended Determination follows the approval of additional funds and period of performance to test and validate the project team's state-of-the-…
The Bonneville Power Administration (BPA) proposes to replace 6 miles of fiber cable on the Noxon Libby No. 1 transmission line from structure 1/1 …
Replacement of reactors in the Ahsahka substation. Improve wildfire mitigation through aerial inspection of overhead power lines, and software upgr…
Pole Integrity, Preventative Vegetation Mgmt w/ an Intelligent Vegetation Mgmt System, Drone and AI- Enhanced Transmission Line Inspections/Repairs…
Upgrading Aging Power Lines and Infrastructure, Upgrade Grid Vulnerabilities with Pole Testing and Change Out, Invest in Drone and Other Technologi…
Idaho National Laboratory's (INL's) core mission is to discover, demonstrate, and secure innovative nuclear energy solutions, clean energy options,…