Categorical Exclusion Determinations: B2.5

Safety and Environmental Improvements of a Facility, and Replacement/Upgrade of Facility ComponentsCX(s) Applied: B2.5Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
1) Create a green revolving loan fund, 2) installation of a green roof covering on the Criallo Science and Technology Center, 3) retrofit building lighting system at the Municipal Government Building, 4) feasibility study for establishing a wind farm including installation of 2 meteorological towers to collect data, 5) installation of an approximate 5 kW solar photovoltaic system and LED lighting and solar-powered lighting in parking lot at the Mariolga Head Start Center, 6) installation of an approximate 5 kW solar photovoltaic system on the Santa Elvira Community Center, and 7) installation of solar hot water heaters and photovoltaic systems on approximately 45 residences and the Villa Turabo Community Center.
Oregon-Tribe-Confederated Tribes of the Grand Ronde Community of OregonCX(s) Applied: A9, A11, B2.5, B5.1Date: 06/13/2011Location(s): Grand Ronde, OregonOffice(s): Energy Efficiency and Renewable Energy
Install Government-Supplied Heating, Ventilation, and Air Conditioning Equipment for National Energy Technology Laboratory's Pittsburgh B-167 Fitness FacilityCX(s) Applied: B1.4, B2.1, B2.5Date: 06/04/2011Location(s): Pittsburgh, PennsylvaniaOffice(s):...