Metering and SCADA updates for Wheatridge Solar and Battery Integration…
Testing and Evaluation of Curb Management and Integrated Strategies to Catalyze Market Adoption of Electric Vehicles…
The scope of the Knolls Laboratory General Plant Project funded-Legacy Radio Replacement Project is to replace an aging radio system with a new two-way radio system, which includes an electrical tie-in to an existing emergency power generator.
Verizon Wireless is upgrading the existing Mobile Access Distributed Antenna System (DAS) and multiple repeater sites located on the SRS facility t…
Demo: GE will connect the cybersecurity appliance to the OT network of a natural gas compressor. No operational changes of the compressor facility…
BPA proposes to integrate a small generation project into its balancing authority (BA) in response to a request from Snohomish Public Utility Distr…
BPA proposes to install generation metering and telemetry equipment for integration of a total 20-megawatt (MW) wave energy project.…
BPA proposes to establish a new communications path and to replace protective relays and control equipment associated with four 230-kilovolt (kV) t…
Funding will support the project team's research and development activities for researching and testing Switched Source’s medium-voltage power flow…
This proposed action evaluates the status of the WTB system and identifies opportunities for improving infrastructure and processes. …