Bonneville Power Administration (BPA) proposes to install a new heating, ventilation, and air conditioning (HVAC) system at BPA’s Covington Substat…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throughout the BPA service territory.
The Proposed Activity provides permanent power to the HVAC unit.…
HMIS Annual Categorical Exclusion (CX) B1.4, Air Conditioning Systems for Existing Equipment for CY 2022…
Install New HVAC for 235-S Lab Trailer…
The subcontractor shall Provide all supervision, labor, materials, tools and equipment to perform the work associated with replacing HVAC Systems i…
Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...
This modification will install Thermoelectric Coolers on seven (7) camera interface panels at 163-70K, CCO Pad.…
Funding will support the project team's applied research activities to test SkyCool's platform radiative cooling technology for enabling air condit…
Activity covers the instillation of a Sunpower Cryotel GT cryocooler in the KIS Vault for use with the Prompt Gamma/Gamma Isotopic System (PG/GIS).…