Replace Willow Creek Maintenance Building Dial Room Air Conditioner CX(s) Applied: B1.4Date: 42558 Location(s): IdahoOffices(s): Nuclear Energy
Estes - Pole Hill, Flatiron - Pole Hill, and Estes - Lyons 115 Kilovolt Transmission Lines Vegetation Management Larimer County, Colorado CX(s) Applied: B1.4Date: 06/01/2016 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mount...
MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment CX(s) Applied: B1.4Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Routine Activities CX(s) Applied: B1.3, B1.4, B1.6, B1.7, B1.9, B1.11, B1.16, B1.17, B1.20, B1.22, B1.23, B1.24, B1.25, B1.30, B1.34, B2.2, B2.3, B2.5, B4.1, B4.2, B4.3, B4.4, B4.6, B4.8, B4.10, B5.1, B5.6Date: 10/25/2015 Location(s): Multiple Location...
Kennewick Radio Station HVAC Replacement CX(s) Applied: B1.4Date: 08/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423 CX(s) Applied: B1.4Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
NWTC Bldg. 251 Roof & RTU-1 Replacement Project, NREL Tracking No. 15-007 Award Number: DE-AC36-08GO28308 CX(s) Applied: B1.16, B2.5, B1.14, B5.1, DOE/EA 1914 National Renewable Energy Laboratory (NREL) Date: 06/05/15 Location(s): CO Office(s):...
Heyburn Substation Heating, Ventilation and Air Conditioning (HVAC) Replacement CX(s) Applied: B1.4Date: 02/25/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Advanced Test Reactor Air Conditioning Upgrades CX(s) Applied: B1.4Date: 02/19/2015 Location(s): IdahoOffices(s): Nuclear Energy
Building 33 Renovation & Site Fence Line Extension CX(s) Applied: B1.4, B1.16, B1.23, B2.1, B2.2, B2.5Date: 41848 Location(s): OregonOffices(s): National Energy Technology Laboratory