Power and communication lines will be fed to the building aboveground through conduit on jersey blocks, underground from an existing pole, or overh…
Bonneville Power Administration (BPA) proposes to rebuild the first 4 miles of its Red Mountain-White Bluffs 115-kV transmission line from Red Moun…
The purpose of the proposed action is to provide a new leased Machining and Fabrication Engineering Laboratory (MFEL) that will include office spac…
Offsite Lease of Office Space for SRNS staff to support ongoing projects.…
The Department of Energy (DOE) proposes to exercise an existing five-year lease extension option for approximately 65,000 gross square feet of rese…
LM is proposing to perfom light detection and ranging (lidar) survey of the disposal cell at the Weldon Spring Site.…
All activities will occur within areas previously disturbed by construction and operation of WAPA and Basin Electric Coop facilities.…
BPA proposes to sell the BPA Hampton Butte Radio Station in Deschutes County, Oregon to the Bureau of Land Management (BLM). The land is currently …
Remove trailers (704-42K and 704-43K) adjacent to the K-Area CCO Pad.…
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to install up to five new monitoring wells within the Institution…