North Parking Lot High Level Waste Canister Fabrication and Concrete Pad Construction CX(s) Applied: B1.15, B1.23 Date: 09/19/2013 Location(s): New York Offices(s): West Valley Demonstration Project
Building 28 Demolition CX(s) Applied: B1.23 Date: 09/17/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Building 30 (B-30) Demolition CX(s) Applied: B1.16, B1.23 Date: 09/17/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Building 19 Mezzanine Demolition Project CX(s) Applied: B1.23 Date: 08/12/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Abandon Metals Structures in N-Area CX(s) Applied: B1.23 Date: 08/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
906-T Air Stripper Dismantle and Removal CX(s) Applied: B1.23 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pittsburgh B901 Mezzanine Project CX(s) Applied: B1.15, B1.23, B2.3 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh B901 Mezzanine Project CX(s) Applied: B1.15, B1.23, B2.3 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 59 Garage Doors Project CX(s) Applied: B1.3, B1.23, B2.1 Date: 06/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory