SWPA proposes to construct a new non-guyed tower, radio/generator buildings, and construct paved and gravel roads to the tower facility from Maynar…
SWPA proposes to construct a new 240 feet high, non-guyed tower, radio-generator buildings, and construct paved and gravel roads to the tower facil…
BPA proposes to install work safety fall protection equipment at communication sites in Washington, Oregon, and Idaho.…
BPA proposes to allow WSDOT to install two antennas on the radio tower at BPA’s Minot Peak Radio Station.…
BPA proposes to fund the Nez Perce Tribe of Idaho for restoration activities in the historical floodplain along River Mile 22 of theWallowa River.…
BPA proposes to allow T-Mobile to upgrade their wireless facilities on BPA’s transmission towers.…
BPA proposes to replace its aging VHF two-way radio system at the Blyn Radio Station.…
Bonneville Power Administration (BPA) proposes to install a new microwave communication antenna on an existing communication tower at BPA’s Hatwai …
The latest capability upgrade requirement is to add LTE Band 4 and Band 5 capability to the existing Wireless Test Bed (WTB) LTE Network. To implem…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade two of its existing telecommunications facilities collocated with BPA-o…