LM is coordinating the detailed requirements for geotechnical and chemical sampling at seven mud pits on Amchitka Island, managed by LM, for a huma…
Award Number: DE-IE0000123, CX(s) Applied: A9, B5.1, Office of Indian Energy, Location(s): AK, Office(s): Golden Field Office
Phase II activities will include completing the NEPA and permitting process, revising the Front-End Engineering Design (FEED) if required, revising…
Award Number: DE-EE0008389, CX(s) Applied: A9, B3.6, B5.25, Water Power Technologies Office, Location(s): AK, Office(s): Golden Field Office
Award Number: DE-EE0007855, CX(s) Applied: A9, B5.1, B5.16, B5.19, Weatherization & Intergov Program, Location(s): AK, Office(s): Golden Field Office
Award Number: DE-IE0000098CX(s) Applied: A9Office of Indian EnergyLocation(s): AKOffice(s): Golden Field Office
Field demonstration of Intergrid inverter technology integrated into existing diesel microgrid to enable high penetration of wind and hydrokinetic …
Award Number: DE-IE0000094CX(s) Applied: A9, B5.18Office of Indian EnergyLocation(s): AKOffice(s): Golden Field Office
Award Number: DE-IE0000112CX(s) Applied: A9, B1.31, B5.1Office of Indian EnergyLocation(s): AKOffice(s): Golden Field Office