Project mgmt, NEPA doc, UIC Class VI permit prep, site characterization(4.1.4,4.3 only), storage field development plan, CO2 source feasibility stu…
SOPO Tasks 1 and 2 - Planning type activities. Many more locations will be added to this project. See attachment, "Form 451 Environmental_State of …
Drilling stratigraphic test well
Develop machine learning algorithms that will process electric utility data. Demonstrate in a utility's IT systems / network. …
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending (CDS) to Clark County, Neveda for an energy effici…
Enhance and integrate existing digital twins for gas turbines, Rankine cycles, and Carbon Capture into a cohesive hydrogen gas turbine combined cyc…
Engineering and construction of a commercial scale system (2 units at 2,500 BPD oil capacity), followed by six months of field testing on a Bayswat…
Develop machine learning algorithms that will process electric utility data and integrate them in a software tool that will will be demonstrated in…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access f…
The U.S. Department of Energy (DOE) is proposing to provide funding to Siemens Energy, Inc. (Siemens) to manufacture and test a rotating olefin cra…